đź‘‹Welcome to Wenture
Preview text: 3 things you'll get as a subscriber, plus a proven way to simplify sales.

Using this email in an article? Credit: Wenture email via They Sent It, with a link to this page. Full-size image
- Subject
- đź‘‹Welcome to Wenture
- Preview text
- 3 things you'll get as a subscriber, plus a proven way to simplify sales.
- From
- kaur@
wenture.io - Brand
- Wenture
- Sent
- Sat Oct 10, 2026, 12:36 PM ET
- Sent to
- wenture.io, Colombia (wenturehub.co), Colombia (wenturekit.co), Colombia (wenturepim.co), Colombia (wenturesight.co)
- Size
- 41 KB
- Images
- 8
- Links
- 15, 6 of them buttons
- Subject length
- 19 characters
Against Wenture's usual
Sent in the 12 PM hour, which holds 8% of its emails; 17% arrive in the 2 AM hour. The subject is 19 characters; its average is 44.
Email headers
What the brand's servers put on this email. Our receiving servers, the address we subscribed with and unsubscribe links are left out.
- From
- Kaur from Wenture <[email protected]>
- Reply-To
- …@em-4014051.wenture.io
- Subject
- đź‘‹Welcome to Wenture
- Date
- Sat, 10 Oct 2026 11:36:27 -0500
- Message-ID domain
- wenture.activehosted.com
- Return-Path domain
- em-4014051.wenture.io
- DKIM signature
- d=wenture.io s=acdkim1; d=acems1.com s=acdkim1
- List-Unsubscribe
- Present, one-click
- Mailer
- ActiveCampaign Mailer
- Feedback-ID sender
- activecampaign
Servers it passed through, newest first
- from localhost.localdomain by acems1.com with ESMTP
Other sending headers (names only): X-KumoRef, X-Report-Abuse, X-mid, X-lid, x-virtual-mta, X-250ok-CID, X-DKIM-Options
Sent just before and after
| Oct 10, 2026 12:36 PM | đź‘‹Welcome to Wenture (this email) | |
| Sep 18, 2026 2:27 AM | How Krah Pipes cut 16 rounds of drawing revisions | |
| Sep 2, 2026 6:11 AM | A building has 9 BIM stages. Read about the 1 that's yours. | |
| Aug 18, 2026 6:06 AM | A big change (and one thing that stays the same) | |
| Jun 10, 2026 9:08 AM | Why your engineers spend half their time on quotes | |
| May 27, 2026 8:13 AM | Shopify wasn't built for your products (and that's okay) | |
| May 19, 2026 8:02 AM | How fast can you actually quote complex products? |
More from Wenture
All Wenture emailsHow Krah Pipes cut 16 rounds of drawing revisions
Sep 18, 2026 2:27 AM
A building has 9 BIM stages. Read about the 1 that's yours.
Sep 2, 2026 6:11 AM
Sent the same day by similar brands
Same ESP and the closest weekly volume, sent on Oct 10, 2026.



